Manitowoc Ice J-0320 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Non Manitowoc Ice J-0320. Manitowoc Ice J-0320 User's Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 1
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
J-0320/J-0420 LEFT SIDE SPLASH SHIELD
Installation Instructions
1. Place ice machine toggle switch in “OFF” position.
2. Clean and dry the left sidewall, without removing the water trough.
3. Remove backing from foam tape which has been applied to mylar splash shield.
4. Install the shield so that the notched out area is placed under the water trough tight to the bottom back corner of the
bulkhead wall.
5. Press the mylar against the sidewall so that the tape adheres.
6. Place ice machine toggle switch in “ON” position.
7. Check one ice making cycle for proper operation.
Manitowoc Ice, Inc.
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA 8009713
Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879 Rev. 06/10/97
Vue de la page 0
1

Résumé du contenu

Page 1

J-0320/J-0420 LEFT SIDE SPLASH SHIELD Installation Instru

Commentaires sur ces manuels

Pas de commentaire